All Articles
Issue
- Any -
Issue 1
Issue 9
Issue 2
Issue 3
Issue 4
Issue 5
Issue 6
Issue 7
Issue 8
Topic
- Any -
WP1 Project Management
WP2 Accelerator Physics and Performance
WP3 IR Magnets
WP4 Crab Cavities and RF
WP5 Collimation
WP6A Cold Powering
WP6B Warm Powering
WP7 Machine Protection and Availability
WP8 Collider Experimental Interface
WP9 Cryogenics
WP10 Energy Deposition and R2E
WP11 11T Dipole
WP12 Vacuum and Beam Screen
WP13 Beam Instrumentation
WP14 Beam Transfer and Kickers
WP15 Integration and (De-)Installation
WP16 IT String and Commissioning
WP17 Infrastructure, Logistics and Civil Engineering
WP18 Controls Technologies
Tag
Apply
Beam instrumentation put to the test
WP13 Beam Instrumentation
23 June, 2025
Beam instrumentation put to the test
WP13 Beam Instrumentation
23 June, 2025
Cold Powering System: confidence and validation for future installations, and series production progress
WP6A Cold Powering
23 June, 2025
Cold Powering System: confidence and valida...
WP6A Cold Powering
23 June, 2025
HL-LHC magnets: progress across the collaborations and at CERN
WP3 IR Magnets
23 June, 2025
HL-LHC magnets: progress across the collabo...
WP3 IR Magnets
23 June, 2025
Evolving collaborations: overview of collaboration status going into LS3
WP1 Project Management
23 June, 2025
Evolving collaborations: overview of collab...
WP1 Project Management
23 June, 2025
Update of project status
WP1 Project Management
23 June, 2025
Update of project status
WP1 Project Management
23 June, 2025
Planning of the 2024 Annual Meeting and Cost & Schedule Review
WP1 Project Management
20 June, 2024
Planning of the 2024 Annual Meeting and Cos...
WP1 Project Management
20 June, 2024
The challenges of magnet sorting for the HL-LHC
WP3 IR Magnets
19 June, 2024
The challenges of magnet sorting for the HL...
WP3 IR Magnets
19 June, 2024
Long Shutdown 3 schedule and readiness review
WP15 Integration and (De-)Installation
19 June, 2024
Long Shutdown 3 schedule and readiness revi...
WP15 Integration and (De-)Installation
19 June, 2024
Status of SM18 test benches for SC magnets and SC-link, and test plan for 2024
WP1 Project Management
19 June, 2024
Status of SM18 test benches for SC magnets ...
WP1 Project Management
19 June, 2024
IT String – results from SQXL commissioning and SCT, and preparations for installation of the cold powering system
WP16 IT String and Commissioning
19 June, 2024
IT String – results from SQXL commissioning...
WP16 IT String and Commissioning
19 June, 2024