Crab Cavities

Overview of Collaboration Status 2024

WP1 Project Management
19 June, 2024
WP1 Project Management
19 June, 2024

Assembly of RFD crab cavity module for delivery to CERN in September

The Cavity-String beamline and Fundamental Power Couplers were assembled in the ISO4 cleanroom jointly with STFC and CERN staff.

WP4 Crab Cavities and RF

Technical reviews of the HL-LHC Beam Dump System, the Collimation System and the Crab Cavity System

The CERN internal review of the HL-LHC Beam Dump System [BDS] took place on February 5th and was chaired by Volker Mertens. It was to a large extent triggered by two observations from the LHC beam operation towards the end of Run2

WP1 Project Management

New Crab Cavity positions and cryogenic shuffling module design

In the Optics 1.5 the crab position in the layout has been reviewed in order to take into account the design constraints of the cryogenic distribution line (QXL). In addition, the new approach guarantees the accessibility of the QXL equipment

WP15 Integration and (De-)Installation
WP15 Integration and (De-)Installation

Report on the CD2 DOE Review

The US HL-LHC AUP effort successfully defended its plans to DOE in December 2018, and was baselined in February 2019. This major step provides the funding agency approval of the total estimated Project cost.

WP3 IR Magnets

Qualifying Magnets and Cavities at FREIA

Uppsala University in Sweden has been a valuable collaborator since the foundation of CERN. In the 1950’s, Uppsala, having just constructed its own cyclotron, contributed to the development of the very first accelerator at CERN: the synchrocyclotron.

WP3 IR Magnets

RFD Cavity Tests at 2K

The two RF dipole crab (RFD) cavities being prototyped for the SPS tests underwent an ultra-pure water rinsing for a period of approximately 7 hours at very high pressure of 100 bar.

WP4 Crab Cavities and RF
WP4 Crab Cavities and RF