Diego Perini (CERN)
First Full Length Prototype of the 11T Dipole Magnet
The construction of the 5.5-m long 11T dipole prototype was completed in May this year after several years of intense work dedicated to the development and optimisation of the special tooling, and of the related manufacturing and inspection procedures.
WP11 11T Dipole
Production Readiness reviews
Two production readiness reviews where conducted at CERN: one for the pressure vessels and one for the MgB2 cable production.
WP6A Cold Powering