DFX
IT String – results from SQXL commissioning and SCT, and preparations for installation of the cold powering system
WP16 IT String and Commissioning
19 June, 2024
Start of Series production of DFHX/M by RFR
The HL-LHC Cold Powering Systems transfer the current from the power converters, located in the new underground galleries, to the new superconducting magnets of the HL-LHC Inner Triplets and Matching Sections at P1 and P5
WP6A Cold Powering
DFX review and design modifications
On the 31st January 2019 (with a 2nd final session on the 12th February), a DFX Conceptual Design Review was held at CERN. The DFX is a key element of the cryogenic powering line for the new magnets of the LHC interaction region at IP1 and IP5.
WP15 Integration and (De-)Installation