
Although most of the HL-LHC beam instrumentation work package is well into production and even integration, some of the more innovative designs are also taking advantage of the final beams in Run 3 to test and optimise their performance. In particular, an electro-optical beam position monitor (e-o BPM) and a Beam Gas Curtain (BGC) profile