Paolo Fessia (CERN)

Optimising HL-LHC activities for the LS3 schedule

WP15 Integration and (De-)Installation
23 June, 2025
WP15 Integration and (De-)Installation
23 June, 2025

Long Shutdown 3 schedule and readiness review

WP15 Integration and (De-)Installation
19 June, 2024
WP15 Integration and (De-)Installation
19 June, 2024

New Crab Cavity positions and cryogenic shuffling module design

In the Optics 1.5 the crab position in the layout has been reviewed in order to take into account the design constraints of the cryogenic distribution line (QXL). In addition, the new approach guarantees the accessibility of the QXL equipment

WP15 Integration and (De-)Installation
WP15 Integration and (De-)Installation

Report from the TCC

The HL-LHC Technical Coordination Committee has continued its work for the follow-up and evolution of the technical baseline of the project in a fully remote format.

WP1 Project Management
WP1 Project Management