Author: Lucía Herrero Álvarez (CERN)
-

From Work Package deliverables to the fully integrated HL-LHC magnet circuits
By nature, HL-LHC magnet circuits span many different technical domains and teams. Two dedicated international reviews – in 2016 and 2019 – and three internal CERN reviews – in 2017, 2020 and 2023 – have helped shape the HL-LHC magnet circuits, the associated instrumentation and the constituting systems being prepared at CERN and throughout the
-

IT String – Completion of installation of major components and start of interconnection works
The HL-LHC IT String installation is entering its final phase in the SM18 building at CERN. All major components are now in place, following a series of installation and validation activities executed by the end of 2024 and beginning of 2025. These tasks have been carried out on schedule, within scope and following extensive preparations